Hadjret en Nouss Combined Cycle Power Plant is a 1,200MW gas fired power project. It is located in Tipaza, Algeria. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2009. Buy the profile here.

Smarter leaders trust GlobalData

Description

The project is currently owned by Shariket Kahraba Hadjret En Nouss with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Light Fuel Oil.

Development status

The project got commissioned in 2009.

Power purchase agreement

The power generated from the project is sold to Sonelgaz under a power purchase agreement for a period of 20 years.

Contractors involved

SNC-Lavalin Group was selected to render engineering procurement construction services for the gas fired power project.

Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block I) is equipped with GE Power A15 steam turbine. The phase consists of 1 steam turbine.

Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block I) is equipped with GE Power Frame 9FB gas turbine. The phase consists of 1 gas turbine.

Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block II) is equipped with GE Power A15 steam turbine. The phase consists of 1 steam turbine.

Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block II) is equipped with GE Power Frame 9FB gas turbine. The phase consists of 1 gas turbine.

Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block III) is equipped with GE Power A15 steam turbine. The phase consists of 1 steam turbine.

Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block III) is equipped with GE Power Frame 9FB gas turbine. The phase consists of 1 gas turbine.

GE Power supplied 450H electric generator for the Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block I).

GE Power supplied 450H electric generator for the Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block II).

GE Power supplied 450H electric generator for the Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block III).

Doosan Enerbility supplied steam boiler for the Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block I).

Doosan Enerbility supplied steam boiler for the Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block II).

Doosan Enerbility supplied steam boiler for the Hadjret en Nouss Combined Cycle Power Plant (Hadjret en Nouss Combined Cycle Power Plant Block III).

SNC-Lavalin Group is the O&M contractor for thermal power project for a period of 20 years.

For more details on Hadjret en Nouss Combined Cycle Power Plant, buy the profile here.

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.