Rangipo is a 120MW hydro power project. It is located on Tongariro river/basin in Waikato, New Zealand. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1983. Buy the profile here.

Description

The project is currently owned by Genesis Energy with a stake of 100%.

The net head of the project is 210m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The project generated 580 GWh of electricity.

The hydro power project consists of 2 turbines, each with 60MW nameplate capacity.

Development status

The project got commissioned in 1983.

Contractors involved

Bharat Heavy Electricals supplied 2 electric generators for the project.

For more details on Rangipo, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.