Suyuan Jianbi Power Plant is a 660MW coal fired power project. It is located in Jiangsu, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2005. Buy the profile here.
Description
The project is currently owned by Guodian Suyuan-Jianbi Power Generation with a stake of 100%.
It is a Steam Turbine power plant that is used for Baseload.
Development status
The project got commissioned in July 2005.
Contractors involved
SEPCOI Electric Power Construction was selected to render engineering procurement construction services for the coal fired power project.
Shanghai Turbine was selected as the turbine supplier for the Coal fired project. The company provided 2 units of N330-16.67/538/538 steam turbines, each with 330MW nameplate capacity.
Shanghai Electric Group supplied electric generator for the project.
Shanghai Electric Group supplied electric generator for the project.
Shanghai Boiler Works supplied steam boiler for the Suyuan Jianbi Power Plant (Suyuan Jianbi Power Plant Unit I).
Shanghai Boiler Works supplied steam boiler for the Suyuan Jianbi Power Plant (Suyuan Jianbi Power Plant Unit I).
Shanghai Boiler Works supplied steam boiler for the Suyuan Jianbi Power Plant (Suyuan Jianbi Power Plant Unit II).
Shanghai Boiler Works supplied steam boiler for the Suyuan Jianbi Power Plant (Suyuan Jianbi Power Plant Unit II).
For more details on Suyuan Jianbi Power Plant, buy the profile here.