Tidong II is a 60MW hydro power project. It is planned on Tidong river/basin in Himachal Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2026 and is expected to enter into commercial operation in 2028. Buy the profile here.
Description
The project is being developed and currently owned by Tidong Hydro Power.
Tidong II is a run-of-river project. The gross head and net head of the project will be 630m and 511.5m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock length will be 825m. The penstock diameter will be 2.1m. The project is expected to generate 211.65 GWh of electricity.
The hydro power project consists of 2 turbines, each with 30MW nameplate capacity.
The project will have 2 electric generators installed at the project site. The generator capacity is likely to be 55.56 MVA.
Development status
The project construction is expected to commence from 2026. Subsequent to that it will enter into commercial operation by 2028.
For more details on Tidong II, buy the profile here.