The Trapeang Prasat Coal Fired Power Plant is 265MW coal fired power project. It is planned in Oddar Meanchey, Cambodia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the under construction stage. It will be developed in multiple phases. The project construction is likely to commence in 2020 and is expected to enter into commercial operation in 2023. Buy the profile here.

Description

The project is being developed by Oddormeanchey Power Industrial. The project is co-owned by Guodian Kangneng Technology and Han Seng Coal Mine, with their respective ownership stake of 50% each.

It is a Steam Turbine power plant.

The project cost is expected to be around $294.3m.

The thermal power project consists of 2 turbines each with 65 MW nameplate capacity and 1 turbines each with 135 MW nameplate capacity respectively.

Development status

The project construction is expected to commence from 2020. Subsequent to that it will enter into commercial operation by 2023.

For more details on Trapeang Prasat Coal Fired Power Plant, buy the profile here.

About Oddormeanchey Power Industrial

Oddormeanchey Power Industrial Co Ltd is an operator of coal power plant in the state of Oddar Meanchey province in Cambodia.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.