Shanxi Yungang Thermal Power Plant is a 1,040MW coal fired power project. It is located in Shanxi, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2003.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,040 | 1,040 | – | Active | Shanxi, China |
---|
Description
The project is currently owned by Datang International Power Generation with a stake of 100%.
It is a Steam Turbine power plant.
Development Status
The project got commissioned in December 2003.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase I Unit I) is equipped with DEC Dongfang Steam Turbine KC200/160-12.7/535/535 steam turbine. The phase consists of 1 steam turbine with 220MW nameplate capacity.
Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase I Unit II) is equipped with DEC Dongfang Steam Turbine KC200/160-12.7/535/535 steam turbine. The phase consists of 1 steam turbine with 220MW nameplate capacity.
Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase II Unit I) is equipped with DEC Dongfang Steam Turbine CZK300 / 258-16.7 / 0.4 / 537/537 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase II Unit II) is equipped with DEC Dongfang Steam Turbine CZK300 / 258-16.7 / 0.4 / 537/537 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
DEC Dongfang Electric Machinery supplied QFSN-220-2 electric generator for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase I Unit I).
DEC Dongfang Electric Machinery supplied QFSN-220-2 electric generator for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase I Unit II).
DEC Dongfang Electric Machinery supplied QFSN-300-2-20B electric generator for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase II Unit I).
DEC Dongfang Electric Machinery supplied QFSN-300-2-20B electric generator for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase II Unit II).
Wuhan Boiler supplied steam boiler for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase I Unit I).
Wuhan Boiler supplied steam boiler for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase I Unit II).
Wuhan Boiler supplied steam boiler for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase II Unit I).
Wuhan Boiler supplied steam boiler for the Shanxi Yungang Thermal Power Plant (Shanxi Yungang Thermal Power Plant Phase II Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.