Wheelabrator Westchester Waste To Energy Plant is a 60MW biopower project. It is located in New York, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1984.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 60 60 Active New York, the US Wheelabrator Technologies

Description

The project is developed and owned by Wheelabrator Technologies.

The project supplies enough clean energy to power 88,000 households.

Municipal solid waste is used as a feedstock to power the project.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in 1984.

Power Purchase Agreement

The power generated from the project is sold to Consolidated Edison under a power purchase agreement.

Contractors Involved

ABB was selected as the steam turbine supplier for the project. The company provided 1 turbine with 60MW nameplate capacity.

Von Roll Environmental Technology supplied steam boiler for the project.

About Wheelabrator Technologies

Wheelabrator Technologies Inc (Wheelabrator) is a clean technology company that offers clean energy services. It supplies renewable electric power through conversion of waste fuels. Its services comprise municipal solid waste disposal service, commercial and industrial waste disposal service, special waste disposal service, metals recovery and recycling, and ash management. Wheelabrator offers special waste disposal services for outdated consumer products, non-hazardous manufacturing or industrial waste, and pharmaceutical or laboratory waste. The company operates power-producing assets across the UK and the US. Wheelabrator is headquartered in Portsmouth, New Hampshire, the US.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.