Ghazlan II Power Plant

Ghazlan II Power Plant, Saudi Arabia

To meet increasing demand in Saudi Arabia, Saudi Consolidated Electricity Company - Eastern region (Sceco-East) has built a 2,400MW power plant. The project is located at Ghazlan, on the coast of the Arabian Gulf, 80km north of Damman.

The site had an existing 1,600MW plant, making it the biggest power station in the Middle East. The new capacity will bring total electricity generation capacity in the Eastern Province to 9,600MW and will meet the future energy needs of the Eastern Province, which accounts for 90% of the total industrial energy consumption in Saudi Arabia.

TIME-LINE FOR CONSTRUCTION

Saudi Arabia has very recently and very quickly become an industrialised nation. The demand for power is swiftly increasing (in 1999 alone it grew by 12%). The country has been spending between $3 and $4 billion dollars on expansion per annum.

Construction actually began several months before final contracts were signed, and the first of the plant's four units came on line in 1999, around three years after work started. Ghazlan II power plant completed construction in March 2001, followed by commissioning including testing and dry runs.

As part of the country's stated goal of 'Saudiization', Sceco-East maximised the local sources of their purchases. Main contractors were also required to use local suppliers where possible, and the new stations are operated by Saudi personnel.

PLANT FUNDING

The overall cost of the Ghazlan II project is reported as $2.7 billion. The largest single investment, other than the actual power plant construction, was for the associated transmission works to cope with the massive increase in supply from the site.

The project was largely financed by Sceco-East internal funds. In addition, a $500 million, ten-year commercial loan was raised from Saudi and foreign banks. These included Saudi French Bank, Chase, Gulf International, National Commercial Bank and Saudi British Bank. Loan pricing was reportedly under 100 basis points over Libor, which is much lower than credits to other Saudi corporations. Having blue chip consumers like Saudi Aramco, which takes almost 30% of Sceco-East power sales, provided important security in a market which otherwise presents serious finance obstacles such as subsidised power prices and lack of transparency.

GHAZLAN II TURNKEY CONTRACT

Japan's Mitsubishi Heavy Industries (MHI) and the US group Bechtel were contracted to design and build the plant as a joint venture. The two companies won the $1.1 billion Ghazlan II turnkey contract against stiff competition from GE, Westinghouse and ABB. The project was one of the highest profile awards in the Middle East of the 1990s. The MHI scope of supply included procurement and installation of four 600MW dual oil and gas-fired steam turbines and generators, a high-voltage substation, storage and pipeline systems for fuel gas and crude oil, and several auxiliary installations. MHI was also responsible for commissioning, staff training and operations and maintenance during the warranty period.

Bechtel provided engineering and construction services as a close partner of MHI. Bechtel's extensive energy industry experience, including major contracts in Saudi Arabia over several decades, undoubtedly underpinned MHI's credibility in the negotiation process.

CONSULTANCY AND CONSTRUCTION CONTRACTS

Consultancy services were provided by a joint venture between Merz and McLellan of the UK and local group Saud Consult. Assignments included construction supervision and engineering and design audits. They won the contract in competition with around a dozen of the leading names in global power consultancy.

Athens-based Consolidated Contractors International Company (CCC) won the $95 million contract for constructing preliminary site works (roads, utilities, marina works and fencing), construction of turbine buildings and two chimneys, and buildings for offices, storage and warehouse facilities.

Four contracts worth over $300 million were awarded for transmission and distribution work associated with the Ghazlan II project:

  • ABB Contracting Co built the Al-Fadhli 380/230kV substation and reinforced the 230kV system in the Northern Operating Area
  • A consortium of Al-Sharif Group and KEC International installed two 380kV transmission lines for linking the Ghazlan plant with the new Al-Fadhli Substation and the existing Ghunan 380/20kV substation
  • Marubeni Saudi Arabia Company won the contract to expand the Ghunan 380/230kV substation
  • Saudi Services for Electro Mechanic Works Co. installed 230kV transmission lines in Jubail and the northern area

A $24 million contract for the construction of management and support services buildings and facilities was awarded to the local Al-Mashrik Contracting Company. Saudi dredging specialist Hute-Sete Marine Works was engaged in cutter-suction dredging for a large seawater intake basin at the Ghazlan Power Plant.

Printable Version Click here for printable version



Expand Image
Sceco-East has built an additional 2,400MW power plant at Ghazlan.
Sceco-East has built an additional 2,400MW power plant at Ghazlan.
Expand Image
The expansion made Ghazlan the biggest power station in the Middle East.
The expansion made Ghazlan the biggest power station in the Middle East.
Expand Image
MHI supercritical steam turbine.
MHI supercritical steam turbine.
FEATURED SUPPLIERS



client logon
Home
Products & Services
Company A-Z
White Papers
Features
Industry News
New On This Site
Jobs & Careers
Events & Exhibitions
Newsletter
Advertise With Us
About Us
Atom FeedRSS Feed
What is RSS?