SEC, Aware Super and Birdwood to build 1.86GWh battery in Victoria
The battery will be situated beside Wodonga Terminal Station on the Victoria–NSW 330kV high-voltage interconnector.
The battery will be situated beside Wodonga Terminal Station on the Victoria–NSW 330kV high-voltage interconnector.
In Shenzhen this week, the Global Low-Carbon Industry Forum opened under the theme ‘Making the Most of Every Ray, Powering the Unpowered.’
The power industry continues to be a hotbed of patent innovation. Activity is driven by increased demand for solar energy...
AI and ML emerge as cornerstones of predictive maintenance in power industry
Cyber espionage in mining: how big is the threat?
The energy transition’s cyber paradox
Autonomous robotics: the new nuclear worker