Cakovec is a 77.44MW hydro power project. It is located on Drava river/basin in Croatia. The project is currently active. It has been developed in single phase. The project construction commenced in 1975 and subsequently entered into commercial operation in 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 77.44 | 77.44 | – | Active | Croatia |
---|
Description
The project is currently owned by HEP-Proizvodnja.
The project generated 427 GWh of electricity.
Development Status
The project construction commenced in 1975 and subsequently entered into commercial operation in 1982.
Contractors Involved
The turbines for the hydro power project have been supplied by GE Renewable Energy and Litostroj Power.
The electric generators for the project were procured from GE Renewable Energy and Koncar Generators and Motors.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.