Hirono Coal Fired Power Plant is a 1,200MW coal fired power project. It is located in Fukushima, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2004.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,200 | 1,200 | – | Active | Fukushima, Japan |
---|
Description
The project is currently owned by JERA with a stake of 100%.
It is a steam turbine power plant.
Development Status
The project got commissioned in July 2004.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Mitsubishi Power was selected as the turbine supplier for thermal power project. The project consists of 2 units of Tandem Compound, Double Exhaust, Reheat Condensing Type turbines, each with 600MW nameplate capacity.
Mitsubishi Power supplied Three-Phase AC Synchronous electric generator for the Hirono Coal Fired Power Plant (Hirono Coal Fired Power Plant Unit I).
Mitsubishi Power supplied steam boiler for the Hirono Coal Fired Power Plant (Hirono Coal Fired Power Plant Unit I).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.