Novo-Irkutsk Thermal Power Station is a 705MW coal fired power project. It is located in Irkutsk, Russia. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1968 and subsequently entered into commercial operation in 1975.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 705 705 Active Irkutsk, Russia

Description

The project is currently owned by Baikal Energy.

It is a Steam Turbine with Cogen power plant that is used for Baseload. The fuel is procured from Eastern Siberia brown coal.

Development Status

The project construction commenced in 1968 and subsequently entered into commercial operation in 1975.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Contractors Involved

EuroSibEnergo was selected to render EPC services for the coal fired power project.

Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit I) is equipped with Leningradsky Metallichesky Zavod PT-60-130 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit II) is equipped with Leningradsky Metallichesky Zavod PT-60-130 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit III) is equipped with Ural Turbine Works T-175-130 steam turbine. The phase consists of 1 steam turbine with 175MW nameplate capacity.

Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit IV) is equipped with Ural Turbine Works T-175-130 steam turbine. The phase consists of 1 steam turbine with 175MW nameplate capacity.

Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit V) is equipped with Ural Turbine Works T-185-130 steam turbine. The phase consists of 1 steam turbine with 185MW nameplate capacity.

Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit VI) is equipped with Leningradsky Metallichesky Zavod R-50-130/13 steam turbine.

Electrosila supplied electric generator for the Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit I).

Electrosila supplied electric generator for the Novo-Irkutsk Thermal Power Station (Novo-Irkutsk Thermal Power Station Unit II).

Sibenergomash supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.