Jandar Combined Cycle Power Plant Extension is a 484MW gas fired power project. It is located in Homs, Syria. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2009. Buy the profile here.

Description

The project is currently owned by Public Establishment for Electricity Generation and Transmission with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant.

The project cost is $488.54m.

Development status

The project got commissioned in 2009.

Contractors involved

MAPNA Turbine Engineering & Manufacturing was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of E-Type steam turbine with 160MW nameplate capacity.

MAPNA Turbine Engineering & Manufacturing was selected as the turbine supplier for the Gas fired project. The company provided 2 units of MGT-70 gas turbines, each with 162MW nameplate capacity.

MAPNA Generator Engineering & Manufacturing supplied electric generator for the project.

MAPNA Generator Engineering & Manufacturing supplied electric generator for the project.

For more details on Jandar Combined Cycle Power Plant Extension, buy the profile here.