The Simhadri Coal Fired Thermal Power Plant is 3,320MW coal fired power project. It is planned in Andhra Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the partially active stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in February 2002. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Simhadri Coal Fired Thermal Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is being developed and currently owned by NTPC. The company has a stake of 100%.

It is a Steam Turbine power plant. The power plant can run on dual-fuel. The primary fuel being used to power the plant will be coal. In case of shortage of coal the plant will run on Heavy Fuel Oil. The fuel will be procured from Kalinga Block of Talcher Coal Fields in Odisha.

Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Expansion) consists of 2 steam turbines with 660MW nameplate capacity.

Development status

Post completion of the construction, the project is expected to get commissioned in February 2002.

Power purchase agreement

The power generated from the project will be sold to Transmission Corporation of Andhra Pradesh under a power purchase agreement. The offtake capacity is expected to be 2,000MW.

Contractors involved

Bharat Heavy Electricals is expected to render engineering procurement construction services for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit I) project. Bharat Heavy Electricals is expected to render engineering procurement construction services for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit II) project. Bharat Heavy Electricals is expected to render engineering procurement construction services for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit III) project. Bharat Heavy Electricals is expected to render engineering procurement construction services for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit IV) project.

Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit I) will be equipped with Bharat Heavy Electricals steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit II) will be equipped with Bharat Heavy Electricals steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit III) will be equipped with Bharat Heavy Electricals steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit IV) will be equipped with Bharat Heavy Electricals steam turbine. The phase consists of 1 steam turbine with 500MW nameplate capacity.

Bharat Heavy Electricals is expected to be the supplier of electric generator for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit I).

Bharat Heavy Electricals is expected to be the supplier of electric generator for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit II).

Bharat Heavy Electricals is expected to be the supplier of electric generator for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit III).

Bharat Heavy Electricals is expected to be the supplier of electric generator for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit IV).

Bharat Heavy Electricals is likely to be the supplier of steam boiler for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit I).

Bharat Heavy Electricals is likely to be the supplier of steam boiler for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit II).

Bharat Heavy Electricals is likely to be the supplier of steam boiler for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit III).

Bharat Heavy Electricals is likely to be the supplier of steam boiler for the Simhadri Coal Fired Thermal Power Plant (Simhadri Coal Fired Thermal Power Plant Unit IV).

For more details on Simhadri Coal Fired Thermal Power Plant, buy the profile here.

About NTPC

NTPC Ltd (NTPC) is an energy company. It has presence in the entire value chain of the power generation business. The company produces electricity and sells it to state power utilities on wholesale basis. NTPC generates electricity using coal, gas, liquid fuel, hydro and other renewable sources. It also provides consultancy, e-mobility solutions, project management and supervision; holds interests in coal mining blocks; and carries out energy trading, oil and gas exploration, training of power professionals, rural electrification, ash utilization and coal mining. NTPC is headquartered in New Delhi, India.

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.