Simutasi is an 110MW hydro power project. It is located on Akeyazi river/basin in Xinjiang Uyghur Autonomous Region, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2014. Buy the profile here.
Description
The project is currently owned by China Gezhouba Group.
The project generated 316.5 GWh of electricity.
The hydro power project consists of 2 turbines, each with 15MW nameplate capacity.
The hydro power project consists of 2 turbines, each with 40MW nameplate capacity.
The project has 2 electric generators installed at the site. The generator capacity is 17.64 MVA.
The project has 2 electric generators installed at the site. The generator capacity is 47.05 MVA.
Development status
The project got commissioned in 2014.
For more details on Simutasi, buy the profile here.