Yedigoze is a 320MW hydro power project. It is located on Seyhan river/basin in Adana, Turkey. The project is currently active. It has been developed in single phase. The project construction commenced in 2009 and subsequently entered into commercial operation in 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 320 | 320 | – | Active | Adana, Turkey | Yedigoze Elektrik Uretim ve Ticaret |
---|
Description
The project was developed by Yedigoze Elektrik Uretim ve Ticaret and is currently owned by Sanko Enerji Uretim Sanayi Ve Ticaret with a stake of 100%.
Yedigoze is a reservoir based project. The project generated 987 GWh of electricity. The project cost is $921.843m.
Development Status
The project construction commenced in 2009 and subsequently entered into commercial operation in 2012.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 160MW nameplate capacity.
GE Renewable Energy supplied 2 electric generators for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.