US DOE backs Holtec Palisades nuclear restart with $1.5bn loan
Acquired by Holtec in 2022, the 800MW project will produce baseload power until at least 2051.
Acquired by Holtec in 2022, the 800MW project will produce baseload power until at least 2051.
Green hydrogen is receiving attention and investment, with major players in the automotive industry showing particular interest.
The power industry continues to be a hotbed of patent innovation. Activity is driven by increased demand for solar energy...
How “energy-hungry AI” is straining grids and spreading climate disinfo
World-first connectivity: Key announcements from MWC24
MethaneSat will remind the oil and gas sector “to get back to work”
Q&A: how will MethaneSat help to reduce methane emissions?